Tenders-Site-Section

                    Tender Title Posted On Download
III call making a platform to placing a washing machine at krishnna girls hostel. 15/03/2019Download
Providing & fixing a Flush door at auditorium. 08/03/2019Download
Providing & fixing aluminium compos panel in admin building 2nd floor right side stair 08/03/2019Download
II call making a platform to placing a washing machine at krishnna girls hostell 25/02/2019Download
Making kitchen trolleys and cupboard door for warden quarter (CF-01) III call 25/02/2019Download
Making kichen trolleys and cupboard door for warden quarter (CF-01)(II call) 09/02/2019Download
Making a platform to placing a washing machine at krishnna girls hostel.04/02/2019Download
Providing static roller, JCB machine, Tipper on hire basis at institute campus24/01/2019Download
Providing & fixing a box type funnel in north end roof of workshop building24/01/2019Download
Making kichen trolleys and cupboard door for warden quarter (CF-01)24/01/2019Download
E-Tender Notice for providing Architectural services to the Institute24/01/2019Download
Providing & laying Cement concrete flooring in Store shed. 27-12-2018Download
Replacing a profile sheet at open well of departmental building(III Call). 23/12/2018Download
Making a new window at nandgiri boy’s hostel mess block kitchen. (III call).23/12/2018Download
Replacing a prA2:A60ofile sheet at open well of departmental building. (II Call).November 16, 2018Download
Making a new window at nandgiri boy’s hostel mess block kitchen. (II call).November 16, 2018Download
Making a new window at nandgiri boys hostel mess block Kitchen.(I call)October 25, 2018Download
PROVIDING UN-SKILLED LABOUR SERVICE TO THE INSTITUTE CAMPUS ( E-Tender )October 16, 2018Download
Providing & fixing aluminium window in nandgiri boys hostel mess blockOctober 15, 2018Download
Replacing a profile sheet at openwell of departmental building.October 15, 2018Download
Replacing a flooring & making a kitchen otta in Ph.D. qtr RQ-06. (III Call)October 11, 2018Download
Dismantling a toilet block at site dept. & making new cabin. (II Call)September 21, 2018Download
Replacing a flooring & making a kitchen otta in Ph.D. qtr RQ-06. (II Call)September 21, 2018Download
Making aluminium partition cabin in automobile lad. at Mechanical engg. dept. (III call)September 21, 2018Download
Dismantling a toilet block at site dept. & making new cabin.September 8, 2018Download
Replacing a flooring & making a kitchen otta in Ph.D. qtr RQ-06.September 8, 2018Download
Making aluminium partition cabin in automobile lad. at Mechanical engg. dept. (II call)September 8, 2018Download
Making aluminium partition cabin in automobile lad. at Mechanical engg. dept. August 25, 2018Download
Making minor civil work at institute campus. August 16, 2018Download
Making Working Platform in Various Classrooms at the Institute. July 21, 2018Download
Making DAIS in various Classrooms.July 21, 2018Download
Providing and installing water sprinkler system at sports arena.July 20, 2018Download
PROVIDING MAN POWER SERVICE TO THE INSTITUTE CAMPUSJuly 18, 2018Download
Providing & fixing Aluminium frame with mosquito net at Godavari girls Hostel.July 10, 2018Download
Making lab tables in Engineering exploration lab in IT Dept.July 10, 2018Download
Providing Un-Skilled Labour Service to the Institute campus.June 30, 2018Download
Providing Skilled Labour Service to the Institute campus.June 30, 2018Download
Providing support services with material for Housekeeping work of the Institute campusJune 30, 2018Download
Providing Security Services at Institute campusJune 30, 2018Download
Providing & applying plaster for dado in Mechanical Engg. Dept. First Floor.June 23, 2018Download
Providing & fixing 3 step round fountain at new Sahyadri Boys Hostel & Front side of Krishna Girls Hostel.(III Call)June 6, 2018Download
Providing & fixing 3 step round fountain at new Sahyadri Boys Hostel & Front side of Krishna Girls Hostel.(II Call)May 9, 2018Download
Making a Aluminium Partition cabin & ceiling in Production Engg. Dept. Drawing hall. (II Call)May 9, 2018Download
Making a Aluminium Partition cabin & ceiling in Production Engg. Dept. Drawing hall.  April 23, 2018Download
Providing & fixing 3 step round fountain at new Sahyadri Boys Hostel & Front side of Krishna Girls Hostel. April 23, 2018Download
Location plan for proposed Departmental building April 6, 2018Download
Providing & fixing WPC wall cladding in Seminar hall of CSE dept.( III Call )March 26, 2018Download
Renovation of Reading room in Godavari Girls Hostel.( III Call )March 19, 2018Download
Extension of R.C.C. Pardi Near New boys Hostel. ( III Call )March 19, 2018Download
Providing & Fixing a Profile sheet at Back side of Sahyadri Boys Hostel Mess block. (III Call)March 19, 2018Download
Providing & Fixing a Profile sheet at Back side of Sahyadri Boys Hostel Mess block. (II Call)March 10, 2018Download
Extension of R.C.C. Pardi Near New boys Hostel. ( II Call )March 10, 2018Download
Renovation of Reading room in Godavari Girls Hostel.( II Call )March 10, 2018Download
Providing & fixing WPC wall cladding in Seminar hall of CSE dept.( II Call )March 10, 2018Download
Making Suspended False ceilling in Machine learning lab , CSE Dept.( III Call )March 8, 2018Download
Providing Support services with material for Housekeeping work.March 8, 2018Download
Providing Security services at the InstituteMarch 8, 2018Download
Making Suspended False ceilling in PLM M-tech hall Mechanical Engg. Dept. (III Call)March 8, 2018Download
Making Hilux partition in Admin Building ground Floor. (III Call)March 8, 2018Download
Providing food requirement for Pragyaa 2018 at the InstituteMarch 1, 2018Download
Providing Tent, sound system and accessories for Pragyaa 2018 at the InstituteMarch 1, 2018Download
Providing & Fixing door Frame at Nandgiri Boys Hostel.(III Call)February 26, 2018Download
Providing & fixing WPC wall cladding in Seminar hall of CSE dept.February 26, 2018Download
Renovation of Reading room in Godavari Girls HostelFebruary 26, 2018Download
Extension of R.C.C. Pardi Near New boys Hostel.February 26, 2018Download
Providing & Fixing 4mm thick Polycarbonate sheet at Sahyadri Boys Hostel Mess block.February 26, 2018Download
Providing & Fixing a Profile sheet at Back side of Sahyadri Boys Hostel Mess block.February 26, 2018Download
Making Hilux partition in Admin Building ground Floor. (II Call)February 24, 2018Download
Making Suspended False ceilling in PLM M-tech hall Mechanical Engg. Dept. (II Call)February 24, 2018Download
Making Suspended False ceilling in Machine learning lab , CSE Dept.( II Call )February 24, 2018Download
Making Hilux partition in Admin Building ground Floor.February 9, 2018Download
Making Suspended False ceilling in PLM M-tech hall Mechanical Engg. Dept.February 9, 2018Download
Making Suspended False ceilling in Machine learning lab , CSE Dept.February 9, 2018Download
Providing & Fixing WC in CSE Department.(III Call )February 6, 2018Download
Providing & Fixing door Frame at Nandgiri Boys Hostel.(II Call)February 6, 2018Download
Providing & applying colouring a admin building external sideJanuary 17, 2018Download
Providing & Fixing WC in CSE Department.(II Call )January 10, 2018Download
Providing & Fixing door Frame at Nandgiri Boys Hostel.January 10, 2018Download
Providing & applying coloring in SGGS Sai Technology Center in Electronics Dept.January 10, 2018Download
Tender For Design, Manufacture, Supply,  Erection, Testing and Commissioning Including Warranty, Operation & Maintenance of Grid Connected  Roof-Top Solar Photovoltaic and Small Solar Power Plants in RESCO Model - III CALL ( MS WORD FORMAT )January 9, 2018Download
Tender For Design, Manufacture, Supply,  Erection, Testing and Commissioning Including Warranty, Operation & Maintenance of Grid Connected  Roof-Top Solar Photovoltaic and Small Solar Power Plants in RESCO Model - III CALL ( PDF FORMAT )January 9, 2018Download
Providing & applying a colouring a water tank at back side of godavari girls hostel. (II Call)December 29, 2017Download
Providing & Fixing WC in CSE Department.December 29, 2017Download
Tender For Design, Manufacture, Supply,  Erection, Testing and Commissioning Including Warranty, Operation & Maintenance of Grid Connected  Roof-Top Solar Photovoltaic and Small Solar Power Plants in RESCO Model - II CALL ( PDF FORMAT )December 15, 2017Download
Tender For Design, Manufacture, Supply,  Erection, Testing and Commissioning Including Warranty, Operation & Maintenance of Grid Connected  Roof-Top Solar Photovoltaic and Small Solar Power Plants in RESCO Model - II CALL ( MS WORD FORMAT )December 15, 2017Download
Providing and fixing face lifting front side of Instrumentation Dept.December 8, 2017Download
Making Toilet Block at sports Arena.December 8, 2017Download
Providing & applying a colouring a water tank at back side of godavari girls hostel.November 29, 2017Download
Providing a Red Murum From Biloli Dist. Nanded For the Institute.November 29, 2017Download
Making roof shed at Godavari Hostel.November 29, 2017Download
Providing Aluminium Pratition for making Cabins for faculty in Mechanical Engg. Dept.November 29, 2017Download
Expression of Interest for Design, Manufacture, Supply, Erection, Testing,& Commissioning Including Warrenty, Operation & Maintenance of Grid Connected Roof-Top solar Photovoltaic & Small Solar Power Plants in RESCO Model.November 24, 2017DownloadSolar Tender (1)
Providing Security services to the Institute Campus.November 22, 2017Download
Making False ceilling in CESH lab. (III Call)November 22, 2017Download
Making False ceilling in CESH lab. (II Call)November 8, 2017Download
Making Furniture work in H.O.D. Cabin in Information Technology dept. ( III Call ) October 5, 2017Download
Making Table in CESH lab. ( II Call )October 5, 2017Download
Making R.C.C. drain at Krishna Hostel.October 5, 2017Download
Making False ceilling in CESH lab.October 5, 2017Download
Making Table for students room in New CESH lab.September 13, 2017Download
Making Back runner board for Instrumentation lab in New CESH lab .September 13, 2017Download
Making Aluminium Partition in Chemistry lab , Textile Engineering Department.September 13, 2017Download
Making a computer table in VLSI lab in E&TC Department (Second Call)August 23, 2017Download
Making working platform in AB-1 to AB-5 class room.August 10, 2017Download
Internal Colouring Work in Residential Qtr.August 10, 2017Download
Making a Computer table in VLSI Lab. In E&TC Department.August 10, 2017Download
Making Wall panel and working platform, in Center for VLSI Design and verification. (Second Call)August 9, 2017Download
Making Furniture work in H.O.D. Cabin in Information Technology dept .(Second Call)August 9, 2017Download
Laying Paver Block for two Wheeler parking near main gate.July 25, 2017Download
Providing & Fixing Aluminium Window In Electrical engg. Dept. Class room EE1 & EE2.July 25, 2017Download
Providing a Red Murum form Biloli Dist. Nanded .July 25, 2017Download
Providing a Soft Murum and Soft soil form Godavari River.July 25, 2017Download
Making Furniture work in H.O.D. Cabin in Information Technology dept .July 25, 2017Download
Making false ceiling in Textile Weaving lab in Civil shed.July 25, 2017Download
Constructing Compound Wall Near Ground.July 25, 2017Download
Making roof shed for load break switch near sports arenaJuly 25, 2017Download
Making New Drainage Line for A & B type Quarter and Laying Paver Blocks in front of “B” type Quarter.July 25, 2017Downloadd
Making Wall panel and working platform, in Center for VLSI Design and verification.July 25, 2017Download
Providing and fixing Tiles flooring & Colouring work in D-Block at B-Type QuarterJuly 25, 2017Download
Colouring in Old OS lab and New N.I Lab, EXTC Department.July 25, 2017Download
Colouring in Old OS lab and New N.I Lab, EXTC Department.July 25, 2017Download
November 29, 2017Download
January 10, 2018
February 6, 2018
February 9, 2018
February 26, 2018
February 26, 2018
March 1, 2018
March 8, 2018
August 25, 2018
September 8, 2018